Project Details
Client | Lincolnshire County Council |
Duration | 52 Weeks |
Type of Work | New Build |
Contract Type | Cost Plus |
Value | £2,000,000 |
Description
The new drama block consists of a steel framed structure on reinforced concrete pad foundations. Internal walls are load bearing masonry with the external fabric of the building being constructed using polished blockwork, larch building and Sto render, incorporating curtain walling with a lightweight composite roof. The building consists of a drama studio, social space, toilet areas, music practise rooms, lift to the 1st floor areas, plant room, music recital rooms and seven general classrooms.
Works were carried out within operation facilities, therefore careful planning and liaison with the client was necessary in order to minimise disruption and ensure the highest standards of safety.