Our Projects

Jack Tighe LTD

Project Details

ClientJack Tighe LTD
Duration48 weeks
Type of WorkNew Build
Contract TypeCommercial
Value£1.6m
ArchitectDesign Space Architecture

Description

Tighe Group, a full-service painting contractor with projects nationwide, was requested to design and build a new head office facility with a workshop facility. The proposed project included two floors of 650m2 for the head office facility and one floor with a mezzanine floor for offices, storage, mess room, and welfare for the workshop facility.

The proposed project presented several challenges for Tighe Group. The first challenge was to design and build a facility that could accommodate the needs of both the head office and workshop facility. The workshop facility required ample storage space, offices, and welfare facilities, while the head office facility required offices and meeting rooms.

The second challenge was to design a facility that could cater to the company’s growth in the future. Tighe Group needed a facility that could adapt to its changing needs and accommodate additional staff and equipment.

The third challenge was to ensure that the facility complied with all relevant building codes and regulations. Tighe Group needed to ensure that the facility was safe, accessible, and energy-efficient.

To meet the challenges of the proposed project, Tighe Group developed a comprehensive plan that incorporated the following solutions:

  1. Customized design: Tighe Group designed a custom facility that addressed the specific needs of the head office and workshop facility. The facility was designed to accommodate storage, offices, meeting rooms, and welfare facilities. The design also incorporated additional space to cater to future growth.
  2. Energy-efficient: The facility was designed to be energy-efficient, with a focus on reducing energy consumption and waste. Tighe Group incorporated energy-efficient lighting, HVAC systems, and insulation to reduce the facility’s carbon footprint.
  3. Compliance with regulations: Tighe Group worked closely with local authorities to ensure that the facility complied with all relevant building codes and regulations. The facility was designed to be accessible, safe, and compliant with all fire and safety regulations.
  4. Quality materials: Tighe Group used high-quality materials to ensure that the facility was durable and long-lasting. The materials used were chosen for their sustainability, functionality, and aesthetic appeal.

The new head office and workshop facility designed and built by Tighe Group was a success. The facility addressed the specific needs of both the head office and workshop facility and provided ample space for future growth. The facility was energy-efficient and compliant with all relevant building codes and regulations. The use of high-quality materials ensured that the facility was durable and long-lasting.

More Information

If you require more information about this project, or any other featured project, please get in touch.

Before You Go!

Don't forget to sign-up for our monthly newsletter to receive our latest news, events and information, straight to your inbox.