




Project Details
| Client | NHS |
| Location | Diana Princess of Wales Hospital, Grimsby |
| Duration | 23 Weeks |
| Type of Work | Conversion |
| Contract Type | Design & Build / Specialist Healthcare Installation |
| Value | £730,000 |
| Architect | Sutcliffe Consulting |
Description
Supporting Advanced Diagnostics
Gelder Group was awarded the contract to deliver a Gamma Camera Suite installation at the Diana Princess of Wales Hospital, enhancing the oncology department with advanced imaging capabilities. The project was completed over a 23-week programme, requiring meticulous planning, coordination and execution within a live hospital environment.
The project’s vision was to provide a state-of-the-art imaging facility that met clinical requirements while ensuring patient safety and operational continuity.
Points to Consider
Delivering a highly specialist medical installation within an operational hospital presented several key challenges:
Shielded Room Construction
The Gamma Camera required a lead-lined room to prevent radiation leakage. Specialist contractors installed the shielding with precision, ensuring complete containment and compliance with safety standards.
Operational Coordination
Extensive liaison with the hospital management, oncology department and clinical teams was essential to maintain uninterrupted services during construction and installation.
IT and Technical Integration
The installation involved high-speed fibre optic cabling and network integration to support advanced imaging technology, requiring collaboration with the hospital’s IT department.
Solutions & Technical Specifications
Gelder Group’s solutions were tailored to meet clinical and technical requirements, including:
Specialist Build Works
Construction of a shielded imaging room, control room, and reception area within the existing hospital footprint.
Mechanical, Electrical & IT Integration
Installation of power, environmental controls, high-speed fiber optic cabling, and network infrastructure to support the Gamma Camera.
Healthcare Compliance
Strict adherence to NHS health and safety standards, infection control protocols, and equipment installation specifications.
Programme Management
Careful scheduling and phasing ensured works were completed within 23 weeks, on budget, and with minimal disruption to hospital operations.
The People Behind the Project
Gelder Group’s team of skilled tradespeople—including electricians, plumbers, engineers, and specialist contractors—worked collaboratively to deliver the project successfully. Close communication with hospital stakeholders and equipment suppliers ensured challenges were addressed proactively and the facility met operational needs.
Community & Clinical Impact
The new Gamma Camera Suite significantly enhances the hospital’s diagnostic capabilities, supporting improved patient pathways, accurate oncology imaging, and faster treatment decisions. The project represents a tangible investment in patient care and the hospital’s long-term service resilience.
Gelder Group Statement
“We are delighted to have delivered the Gamma Camera Suite at the Diana Princess of Wales Hospital. Throughout the project, our team worked hand-in-hand with hospital staff, bringing dedication, skill, and collaboration to every stage. This facility not only meets the highest technical and safety standards but also supports clinicians, enhances patient care, and makes a real difference to the local community. We’re proud of what our people have achieved and the lasting impact this project will have.”




